PLANS IN HAND BEFORE YOU MOBILIZE.
HazCom · Maryland

Hazard Communication Program for every trade in Maryland.

Most safety directors in Baltimore can tell a template from a plan in the first page. This Hazard Communication Program is built from your scope, your hazards, and your people.

What GCs in Maryland check for

It is on every GC checklist and is often the first thing an ISNetworld or Avetta audit asks for. The reviewer looks for a product inventory for this project, where the SDS binder is, who administers the program, and the training section.

The plan is written for a Maryland project address, so the Maryland requirements a GC in Baltimore expects to see are included, not left for you to add.

  • MOSH enforces the state program with Maryland additions.
  • Maryland adopted a heat stress standard in 2024 requiring a written plan at a heat index of 80 degrees.

It reads like a plan a safety professional wrote for this job because the structure was written that way, against 29 CFR 1910.1200(e) as applied to construction by 1926.59, before your answers went in.

The sample pages on this site are for a fictional electrical sub; your plan reads the same way with your project, your GC, and your crew.

What’s inside

  1. 1.Purpose and scope
  2. 2.Chemical inventory
  3. 3.Labels and other forms of warning
  4. 4.Safety Data Sheets and where they are
  5. 5.Training
  6. 6.Non-routine tasks
  7. 7.Multi-employer worksites
  8. 8.Signatures

$149 once. No account, no subscription, 30-day edits, 30-day refund.

Questions from Maryland every sub

Is a HazCom program required for a small subcontractor in Maryland?
Yes, for any employer whose workers use or are exposed to hazardous chemicals, which includes adhesives, solvents, fuels, and cement products. Maryland runs its own state plan, enforced by Maryland Occupational Safety and Health (MOSH), so the plan follows federal 1926 plus the state's additions.
Do I need an SDS for every product?
Yes, for every hazardous product you bring to the site, on site and reachable during the shift. The wizard pre-fills the usual products for your trade; you add yours and say where the binder is.
Does a hazard communication program have to be state-specific in Maryland?
Maryland runs its own state plan, enforced by Maryland Occupational Safety and Health (MOSH), so the plan follows federal 1926 plus the state's additions. Your plan is written for the project address, and where Maryland has its own rule on the subject the plan says so and applies the stricter requirement.
Is this OSHA-approved?
No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
How long does it take?
About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
What if the GC asks for changes?
Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.