Silica Exposure Control Plan for concrete, masonry, and demolition contractors in Utah.
Pre-mob paperwork due and the Silica Exposure Control Plan is the one holding up the badge? Answer ten questions and it is written for the project, not copied from a template.
What GCs in Utah check for
GCs and OSHA inspectors ask for the written plan by name under 29 CFR 1926.1153(g). They look for each task matched to its Table 1 row, the competent person, the housekeeping rules (no dry sweeping or compressed air), and how you keep other trades out of the dust.
Utah GCs, especially in Salt Lake City, review subcontractor plans before badging. The plan is built to pass that review the first time.
- UOSH enforces the state program, which adopts federal 1926 with Utah additions.
Reviewers check for named people with a basis, hazards matched to scope, and a signature page. All three are built in, written to 29 CFR 1926.1153 and Table 1.
Nothing here is OSHA-approved, because nothing is. What you get is a plan that names the right people, matches the scope, and is signed by you.
What’s inside
- 1.Purpose and scope
- 2.Tasks involving respirable crystalline silica
- 3.Table 1 task mapping and engineering controls
- 4.Housekeeping methods
- 5.Restricted access and communication
- 6.Competent person
- 7.Medical surveillance and training
- 8.Signatures
$149 for the document, with free edits and regeneration for 30 days and a full refund if the GC rejects it.
Questions from Utah concrete and masonry subs
- Who enforces the silica standard in Utah?
- Utah runs its own state plan, enforced by Utah Occupational Safety and Health (UOSH), so the plan follows federal 1926 plus the state's additions. The respirable crystalline silica standard for construction applies either way, and the plan is written to 1926.1153(g).
- Do I need air monitoring?
- Not for tasks that match a Table 1 entry and follow its control fully. Tasks outside Table 1 need objective data or exposure monitoring; the plan has a section for those and tells you what it requires.
- Does a silica exposure control plan have to be state-specific in Utah?
- Utah runs its own state plan, enforced by Utah Occupational Safety and Health (UOSH), so the plan follows federal 1926 plus the state's additions. Your plan is written for the project address, and where Utah has its own rule on the subject the plan says so and applies the stricter requirement.
- Is this OSHA-approved?
- No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
- How long does it take?
- About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
- What if the GC asks for changes?
- Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.
