PLANS IN HAND BEFORE YOU MOBILIZE.
HazCom · South Dakota

Hazard Communication Program for every trade in South Dakota.

Written for the project address in South Dakota, with the state's own rules applied where they differ from federal OSHA.

What GCs in South Dakota check for

It is on every GC checklist and is often the first thing an ISNetworld or Avetta audit asks for. The reviewer looks for a product inventory for this project, where the SDS binder is, who administers the program, and the training section.

South Dakota GCs, especially in Sioux Falls, review subcontractor plans before badging. The plan is built to pass that review the first time.

  • Federal OSHA standards apply to private construction.

The structure follows 29 CFR 1910.1200(e) as applied to construction by 1926.59, so the sections a reviewer expects are in the order they expect them.

It says on page one that the plan was prepared from your answers and that you adopt and implement it. Reviewers trust that more than a badge that no agency issues.

What’s inside

  1. 1.Purpose and scope
  2. 2.Chemical inventory
  3. 3.Labels and other forms of warning
  4. 4.Safety Data Sheets and where they are
  5. 5.Training
  6. 6.Non-routine tasks
  7. 7.Multi-employer worksites
  8. 8.Signatures

$149 for the document, with free edits and regeneration for 30 days and a full refund if the GC rejects it.

Questions from South Dakota every sub

Is a HazCom program required for a small subcontractor in South Dakota?
Yes, for any employer whose workers use or are exposed to hazardous chemicals, which includes adhesives, solvents, fuels, and cement products. Private construction in South Dakota is covered by federal OSHA (Federal OSHA (Sioux Falls area office)).
Do I need an SDS for every product?
Yes, for every hazardous product you bring to the site, on site and reachable during the shift. The wizard pre-fills the usual products for your trade; you add yours and say where the binder is.
Does a hazard communication program have to be state-specific in South Dakota?
Private construction in South Dakota is covered by federal OSHA (Federal OSHA (Sioux Falls area office)). Your plan is written for the project address, and where South Dakota has its own rule on the subject the plan says so and applies the stricter requirement.
Is this OSHA-approved?
No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
How long does it take?
About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
What if the GC asks for changes?
Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.