PLANS IN HAND BEFORE YOU MOBILIZE.
SSSP · New Mexico

Site-Specific Safety Plan for subcontractors in New Mexico.

A GC in Albuquerque wants a Site-Specific Safety Plan that names this project, this crew, and this scope. That is what you get here, in Word and PDF, English and Spanish.

What GCs in New Mexico check for

The GC's safety director checks it against the subcontract's safety exhibit before you can badge in: named competent persons with a basis, hazards matched to your scope, an emergency plan with the nearest hospital, a training and orientation section, and a signature page. A corporate manual does not pass; it has to name this project.

The plan is written for a New Mexico project address, so the New Mexico requirements a GC in Albuquerque expects to see are included, not left for you to add.

  • New Mexico enforces the state program, which adopts federal 1926 with state additions.

Nothing in it is boilerplate you have to hunt through: the hazards come from your tasks and equipment, the controls from a library written to ANSI A10.33 project structure, OSHA 1926 subparts by hazard, and the USACE A-02 reviewer checklist.

Competent persons, the nearest hospital, the muster point, and the emergency chain are all in it, because those are the lines a reviewer checks first.

What’s inside

  1. 1.Project information
  2. 2.Responsibilities
  3. 3.Competent persons
  4. 4.Hazard analysis by task
  5. 5.Fall protection
  6. 6.Electrical safety / LOTO
  7. 7.Silica and dust
  8. 8.Emergency action plan
  9. 9.Training and toolbox talks
  10. 10.Signatures

$199 once. No account, no subscription, 30-day edits, 30-day refund.

Questions from New Mexico subs

What do GCs in New Mexico ask for in a site-specific safety plan?
The same core elements across Albuquerque and Santa Fe: scope of work, a hazard analysis by task, controls for each hazard, named competent persons, an emergency plan with the nearest hospital, training and orientation, incident reporting, and a signed acceptance page. New Mexico enforces the state program, which adopts federal 1926 with state additions.
Is a corporate safety manual enough?
Usually not. Subcontract safety exhibits ask for a plan written for this project: the project name, the GC, the scope, the site's hazards, and the people on this crew. That is what the plan generates.
Does a site-specific safety plan have to be state-specific in New Mexico?
New Mexico runs its own state plan, enforced by New Mexico Occupational Health and Safety Bureau, so the plan follows federal 1926 plus the state's additions. Your plan is written for the project address, and where New Mexico has its own rule on the subject the plan says so and applies the stricter requirement.
Is this OSHA-approved?
No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
How long does it take?
About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
What if the GC asks for changes?
Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.