PLANS IN HAND BEFORE YOU MOBILIZE.
SSSP · Delaware

Site-Specific Safety Plan for subcontractors in Delaware.

The Site-Specific Safety Plan is the document Subcontractors in Delaware submit most often and rewrite most often. Here it is generated from the project details in one pass.

What GCs in Delaware check for

The GC's safety director checks it against the subcontract's safety exhibit before you can badge in: named competent persons with a basis, hazards matched to your scope, an emergency plan with the nearest hospital, a training and orientation section, and a signature page. A corporate manual does not pass; it has to name this project.

Because the project is in Delaware, the plan's state section covers what Federal OSHA and local GCs ask about beyond the federal baseline.

  • Federal OSHA standards apply to private construction.

Nothing in it is boilerplate you have to hunt through: the hazards come from your tasks and equipment, the controls from a library written to ANSI A10.33 project structure, OSHA 1926 subparts by hazard, and the USACE A-02 reviewer checklist.

Nothing here is OSHA-approved, because nothing is. What you get is a plan that names the right people, matches the scope, and is signed by you.

What’s inside

  1. 1.Project information
  2. 2.Responsibilities
  3. 3.Competent persons
  4. 4.Hazard analysis by task
  5. 5.Fall protection
  6. 6.Electrical safety / LOTO
  7. 7.Silica and dust
  8. 8.Emergency action plan
  9. 9.Training and toolbox talks
  10. 10.Signatures

It costs $199, takes about 15 minutes, and comes back in Word and PDF with a Spanish copy.

Questions from Delaware subs

What do GCs in Delaware ask for in a site-specific safety plan?
The same core elements across Wilmington and Dover: scope of work, a hazard analysis by task, controls for each hazard, named competent persons, an emergency plan with the nearest hospital, training and orientation, incident reporting, and a signed acceptance page. Federal OSHA standards apply to private construction.
Is a corporate safety manual enough?
Usually not. Subcontract safety exhibits ask for a plan written for this project: the project name, the GC, the scope, the site's hazards, and the people on this crew. That is what the plan generates.
Does a site-specific safety plan have to be state-specific in Delaware?
Private construction in Delaware is covered by federal OSHA (Federal OSHA (Wilmington area office)). Your plan is written for the project address, and where Delaware has its own rule on the subject the plan says so and applies the stricter requirement.
Is this OSHA-approved?
No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
How long does it take?
About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
What if the GC asks for changes?
Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.