PLANS IN HAND BEFORE YOU MOBILIZE.
SSSP · Colorado

Site-Specific Safety Plan for subcontractors in Colorado.

Most safety directors in Denver can tell a template from a plan in the first page. This Site-Specific Safety Plan is built from your scope, your hazards, and your people.

What GCs in Colorado check for

The GC's safety director checks it against the subcontract's safety exhibit before you can badge in: named competent persons with a basis, hazards matched to your scope, an emergency plan with the nearest hospital, a training and orientation section, and a signature page. A corporate manual does not pass; it has to name this project.

The plan is written for a Colorado project address, so the Colorado requirements a GC in Denver expects to see are included, not left for you to add.

  • Federal OSHA standards apply to private construction.
  • Altitude, cold, and afternoon lightning show up in GC pre-mob checklists along the Front Range.

The skeleton is authored once against ANSI A10.33 project structure, OSHA 1926 subparts by hazard, and the USACE A-02 reviewer checklist and reviewed against the checklists GCs actually use; the generated text only writes the connective paragraphs.

The sample pages on this site are for a fictional electrical sub; your plan reads the same way with your project, your GC, and your crew.

What’s inside

  1. 1.Project information
  2. 2.Responsibilities
  3. 3.Competent persons
  4. 4.Hazard analysis by task
  5. 5.Fall protection
  6. 6.Electrical safety / LOTO
  7. 7.Silica and dust
  8. 8.Emergency action plan
  9. 9.Training and toolbox talks
  10. 10.Signatures

$199 once. No account, no subscription, 30-day edits, 30-day refund.

Questions from Colorado subs

What do GCs in Colorado ask for in a site-specific safety plan?
The same core elements across Denver and Colorado Springs: scope of work, a hazard analysis by task, controls for each hazard, named competent persons, an emergency plan with the nearest hospital, training and orientation, incident reporting, and a signed acceptance page. Federal OSHA standards apply to private construction.
Is a corporate safety manual enough?
Usually not. Subcontract safety exhibits ask for a plan written for this project: the project name, the GC, the scope, the site's hazards, and the people on this crew. That is what the plan generates.
Does a site-specific safety plan have to be state-specific in Colorado?
Private construction in Colorado is covered by federal OSHA (Federal OSHA (Denver and Englewood area offices)). Your plan is written for the project address, and where Colorado has its own rule on the subject the plan says so and applies the stricter requirement.
Is this OSHA-approved?
No document is. OSHA and the state programs do not approve written plans; they inspect against them. This plan is prepared from your answers, says so on page one, and you adopt and implement it. That is what a GC's safety director is checking for.
How long does it take?
About 15 minutes of questions on your phone, then the documents generate in under two minutes. Word and PDF, English and Spanish, with your logo on the cover.
What if the GC asks for changes?
Edit your answers and regenerate as often as you like for 30 days at no charge. Every version stays downloadable. If it is not what you needed, reply to any of our emails within 30 days for a full refund.